Disabled Facilities Grant Contractors: Quotes, Builders and the Schedule of Works
Once the OT has identified the works, contractor estimates are normally part of preparing the formal DFG application. This is the stage where many applications stall — finding builders willing to work to a council specification, getting competitive prices, and understanding who controls the procurement process.
How Many Quotes Do You Need?
Applications are normally required to include at least two estimates from different contractors for the proposed works. Authorities would not normally be expected to require more than two, except in exceptional cases such as very extensive and expensive works. This is national guidance rather than a requirement set by the Housing Grants, Construction and Regeneration Act 1996 itself.
An authority may use its discretion to require only one estimate for small or specialised works, where it is difficult to find contractors, or where an approved schedule of rates or framework is used.
The application should include a detailed breakdown of the works along with competitive estimates. Ask the council what format it needs so the estimates cover the same proposed work and can be compared fairly.
The Schedule of Works
The schedule of works is the detailed specification of what is being built. It is drawn up after the OT's recommendation, usually by:
- The council's in-house technical officer or surveyor
- A Home Improvement Agency (HIA) managing the case
- An architect or surveyor appointed by you (their fees are eligible grant costs)
The schedule can cover dimensions, materials, structural details, drainage, electrical work and finishes. The contract is between you and the contractor, so check that the contract documents describe the approved work clearly.
You should read it carefully before it goes to contractors. If the specification does not match what the OT recommended — a different shower layout, a narrower doorway, an omitted grab rail — raise it with the housing grants officer before quotes are obtained. Changes after contractors have priced the work cause delays and re-quotes.
Finding Contractors
If your council has a Home Improvement Agency or a framework contractor panel, they may source quotes for you. Some councils use approved schedules of rates or framework agreements for adaptation work, which can simplify and speed up the process.
If you are sourcing your own builders, look for contractors experienced with adaptation work. General builders can do the structural work, but DFG projects involve specific requirements — level-access threshold details for wet rooms, grab rail fixings into solid blockwork, stairlift wiring, and compliance with the schedule of works down to the last item.
Checklist for each quote:
- Itemised against every line in the schedule of works
- Clear start and completion dates
- Statement of insurance (public liability and employer's liability)
- VAT treatment (many disability adaptations are zero-rated for VAT under the VAT Act 1994)
Free Download
Get the Disabled Facilities Grant Checklist
Everything in this article as a printable checklist — plus action plans and reference guides you can start using today.
What Happens If Quotes Exceed £30,000
If both quotes come in above the £30,000 mandatory cap, the council faces a decision. It may:
- Ask the technical officer to review the specification for cost savings without compromising the adaptation's purpose
- Invite you to apply for discretionary top-up funding under the council's Housing Assistance Policy
- Approve the grant at £30,000 and ask you to fund the excess yourself
The council cannot refuse the application simply because the works cost more than £30,000. The mandatory duty is to approve a grant up to the cap for works that meet the statutory tests.
Do Not Start Work Before Approval
This is critical. The council cannot normally approve a DFG application if the works have already begun. If works have started but are incomplete, the council may approve the application where it is satisfied there were good reasons for the early start — but this is at the council's discretion, not your right. Works that have been completed before approval cannot be funded at all.
Wait for the formal written approval letter. Only then should the contractor begin.
During and After the Build
The contractor works to the approved schedule. Government guidance says a supervising officer should visit major adaptations at least once while work is in progress. At completion, you should be asked to confirm that you accept the work; for complex projects it is good practice for the person who assessed the need to confirm the adaptation is suitable. Grant payments are usually made directly to the contractor; the council must tell you this before approval.
Approved works must be completed within 12 months of the formal approval date. If delays arise — contractor insolvency, supply shortages, weather — ask the authority promptly to agree an extension.
For a detailed walkthrough of managing the contractor stage and what to do if things go wrong, the Disabled Facilities Grants in England guide covers the full process from quotes to sign-off.